Thuligad Khola Hydropower Project (17MW)

Thuligad Khola Hydroelectric Project is situated at Badikedar Rural Municipality Doti District, Sudurpaschim Province. Geographically the area lies between latitude 28o 55’ 50” to 28o 58’ 47” N and longitudes 80o 47’ 41” E to 80o 51’ 22” E.The proposed project area lies at an elevation between 512.5 masl to 686 masl. Thuligad Khola is […]

View Project
MAYA KHOLA HYDROPOWER PROJECT

MAYA KHOLA HYDROPOWER PROJECT

  • PROJECT TITLE:  MAYA KHOLA HYDROPOWER PROJECT
  • TASK:  DETAILED DESIGN OF UNDERGROUND STRUCTURES
  • CAPACITY: 14.9 MW
  • STATUS: COMPLETED
View Project
UPPER BALEPHI A HYDROELECTRIC PROJECT

UPPER BALEPHI A HYDROELECTRIC PROJECT

  • PROJECT TITLE:  UPPER BALEPHI A HYDROELECTRIC PROJECT
  • TASK:  DETAILED DESIGN OF UNDERGROUND STRUCTURES
  • CAPACITY: 36 MW
  • STATUS: COMPLETED
View Project